Boeing’s tanker bid damaged when Air Force changed criteria, Dicks says

WASHINGTON — During a contentious hearing Wednesday over the Air Force tanker deal awarded to Airbus parent EADS and Northrop Grumman, Rep. Norm Dicks said the Pentagon changed contract specifications to favor that team’s bid over Boeing’s so they wouldn’t drop out of the contest.
Click here for the story

Leave a Reply

Your email address will not be published. Required fields are marked *

The maximum upload file size: 512 MB. You can upload: image, audio, video, document, spreadsheet, interactive, text, archive, code, other. Links to YouTube, Facebook, Twitter and other services inserted in the comment text will be automatically embedded. Drop files here