“Johns Creek” shares blame with geese for frequent Coulon Beach swim closures

While currently open as of this writing, Coulon Beach swim area was closed during the Memorial Day weekend and the first above 80-degree day of the season.

Coulon Beach Park swim area was closed on this sunny Memorial Day weekend because of high bacterial counts.  It was one of only two beaches on Lake Washington closed for this reason.  Unfortunately this has become more common in recent years, with Coulon’s swim area sometimes closed for weeks at a time.

Renton’s Coulon Park swim beach was closed while most local beaches were open during this warm holiday weekend.

While it’s clear that ducks and geese are contributing to the problem, it’s less obvious to Park visitors that storm drains in western Renton Highlands, the Landing and even I-405 are also contributing to the problem by adding pollution to “Johns Creek” which empties next to Coulon’s swim beach.

Renton has been working for decades to improve the water quality in Johns Creek, and a Stormwater Management Action Plan (SMAP)  is in place to improve it.  Renton Stormwater utility fees, along with grants when they can be obtained, pay for this work.

Johns Creek is not the only creek that carries Renton’s surface water into Coulon Park; Kennydale Creek deposits Kennydale’s surface water about a mile to the north.  But in addition to emptying further away from the swim beach, Kennydale Creek flows mostly in a natural creek bed open to the sun and air, which helps reduce bacteria levels.  Johns Creek flows through many pipes and culverts, only in open air as it nears Coulon Park.

So to keep our swim beach open, businesses and residents in Renton Highlands, the Landing, Paccar, Southport and parts of North Renton should help keep our street gutters clean and spread the word that whatever flows into storm drains can flow right into the Coulon Beach Swim area.

The following photos and maps give more information about this little-known creek and the plans in place to improve it.

Continue reading →

It’s past time to remove the rusting and abandoned power towers on Sunset Blvd NE

A trellis for invasive plants?  This rusting tower and others like it on Sunset Blvd NE perform no useful function. The electric wires were removed years ago, and the towers are just abandoned and disintegrating in place.

It’s way past time for the Electric Utility to remove the derelict power line towers on Sunset.  Our views in Renton are cluttered enough by power lines, that we don’t need a bunch of additional rusting towers adding their own blight.

I took these photos two years ago, and the scene is no different today (other than a little more weed growth and more rust. )

This power line was abandoned and replaced by a new run many years ago, but the retired power lines were initially left in place.  Several years ago copper thieves began climbing the towers and stealing the wire, so as a safety measure the power company removed the rest of the wire.

I assumed they would eventually apply for demolition permits to remove the ugly, unnecessary towers, but that has not happened.  I’ve expressed my displeasure to our local utilities in the past that they never seem to prioritize maintaining the appearance of their easements in Renton.  This is just one example of it.

I don’t remember whether these were owned by PSE or Seattle City Light, but in either case the City of Renton should lean on them to take them down and clean up this easement.

You may have to look closely to realize there are no wires going to this large electrical truss tower that pointlessly interferes with views in the Windsor Hills neighborhood.

 

 

The abandoned towers are in the greenbelt between I-405 and Sunset Blvd NE
Himalayan Blackberry, english Ivy, and other invasive plant species climb the rusting structures, spreading seeds through wind and birds to nearby homes.
The two towers shown are the closest to the street. There are several other abandoned towers in the greenbelt to the north of these.

Union Ave NE school zone signage needs review

It seems nonsensical to have an “End School Zone” sign followed so closely by a photo-enforced school zone camera, as shown in this image from southbound Union Ave NE.

When I was on City Council I used to let Public Works know when I saw confusing signage, and I’m not going to stop doing it now.  The arrangement on southbound Union Ave NE that puts an “End School Zone” sign right before a school zone with a speed camera seems like a definite mixed-message.

Any motorist trying to accelerate to the posted speed limit of 30 MPH in this gap will have to immediately hit the brakes to avoid a ticket.  And they’ll make these speed changes passing through the intersection with NE 10th Street, where their variable speed will be confusing for drivers turning onto Union.

Every sign diverts drivers eyes and attention from the road for a second or two, which is enough time to travel 20 or 30 feet at the posted speed limit. Diverting drivers’ attention from the road, and making it confusing, is especially undesirable in areas around schools.

In short, it seems like it would be a good idea to merge the two school zones.

This confusing signage could be a result of an Arizona contractor, American Traffic Solutions. They install and operate Renton’s speed and red-light cameras, in exchange for a cut of the revenue from traffic fines.  Even if they are the ones that engineered this, the City of Renton should take a look at it, and see if the configuration really makes sense.

(I’ve spurred other fixes to photo enforcement cameras, like this one at McKnight Middle School. )

 

The “End School Zone” sign is posted right before the intersection with NE 10th Street. Half a block further south the school zone camera tickets drivers for not observing the Honey Dew school zone.

 

Sunset Neighborhood Park completion, including playgrounds and water feature, coming soon!

Click here for a full-size PDF   of the Sunset Neighborhood Park  Masterplan Revised Phase II-2018

Many residents have asked me for more details regarding the plan for the Sunset Neighborhood Park, which is off to an excellent start but is not complete yet. Phase 1 included an entry plaza by the library with seating and overhead pergola, restroom facilities, wide walkways,  a large lawn area, and rain gardens.

Continue reading →

Renton Highlands Revitalization still moving forward even with setback at Hi-Lands Shopping Center

Photo courtesy of www.sunsetrenton.com

Renton residents got a first hand account of my reaction when I learned the builder had pulled out of the Hi-Lands Shopping Center renovation right after making the long-time tenants move out.  I got the news in a public meeting, and reporter Haley Ausbun did an excellent job of recording my candid reaction in an article in the Renton Reporter. “The loss of the Solera Project came as a shock to Corman at the March 18 Committee of the Whole meeting.” …“This shopping center has been ground zero of the Highland redevelopments for probably 20 years at least,” Corman said.”  …”Corman also said he was disappointed, and doesn’t understand what led the eviction to happen so early.”…“We’re trying to do a revitalization, not end up with a shuttered shopping center,” Corman said at the meeting. “It’s been such a long road to get here.”

In summary, I share the community’s disappointment in the way the Hi-Lands Shopping Center business timing was handled.  I’m also working with our city’s economic development department to help ensure the planned renovation project gets going again soon, and that we don’t miss any opportunities to find homes for the businesses that were displaced.

With that said, I want to assure the Community that Renton Highlands Revitalization, also known as “Sunset Area Transformation” is proceeding at a brisk pace.  A beautiful, sustainable, inclusive, and thriving Renton Highlands, including new market-rate and affordable housing, improved transit, and an all-new “parkway-style” Sunset Boulevard, is just a few short years away.  In city-building time scales, it’s just around the corner.

The 11-acre Highlands Shopping Center is a part of the overall plan, but only a small part, as the entire improvement area covers 269 public and private acres.  Decades ago, during a bleak period when businesses were pulling out of the highlands,  I encouraged  the council to put $1,500,000 in a fund to jump-start Highlands Revitalization .  We’ve targeted this money for infrastructure, property acquisition, and planning,  including creation of the award winning Highlands Revitalization Plan that is summarized well in this “CityLab” news article here.    In author Kaid Benfield’s words, “If you’re looking for exemplary revitalization with new, first-class green infrastructure, community facilities and mixed-income housing, take a look at what’s happening in the Sunset district of Renton, Washington, a city of about 90,000 people south of Seattle.”

It took countless meetings with residents, businesses, and dozens of governmental and charitable stakeholders, to arrive at the highly collaborative and successful plan we are working to today.  We had some notable rough spots in the early days of creating the plan, and through it all I personally worked hard to help keep residents and property owners on board through every step.  We also suffered a small setback when one of our first demonstration projects, Harrington Square Apartments, suffered a dramatic fire while being roofed during construction,  before the building’s fire walls and fire-fighting features were completed.  Thankfully no one was hurt, and our dedicated firefighters aided by  recently enlarged water lines and reservoirs were able to readily contain it.

In recent years we have re-worked the plan to make it an even more collaborative and co-owned  product of 28 stakeholders/partners, maximizing our opportunity for County, State, Federal, and private grants.  Because the Sunset Transformation Plan is so comprehensive, including new housing and transit, it has been successful in pulling in many millions of dollars in outside assistance.  Most recently, King County pledged $5,000,000 towards this plan and hundreds of thousands of extra hours of bus service to Renton in support of the important new housing that is going into the area.  We’ve also been able to acquire grants to allow us to simultaneously complete phases 2 and 3 of the park near the library, which will bring new playgrounds, water features,  shelters, tables and seating to the park, completing it.

Within the private development community, this plan is well known, and we expect to see an increasing number of private retail and housing projects on the Sunset corridor in the next decade.  This will help us meet growth management targets, while keeping the high-density housing on appropriate corridors where it does not increase traffic in single-family neighborhoods.

I’m excited about this plan and I hope you are too.  I’ve worked on it 20 years, and as Mayor I plan to see it through to completion.  As always, please feel free to comment with your thoughts below.

For a virtual year-book of Highland Revitalization Discussions and related blogs, search “Highlands” in my search bar or simply click here